1.SAMAGRA PARIKSHAN:
The activities carried out are-
i) Field Testing/ Onsite Testing of electrical equipment of all AIS &GIS substation/switchyard, transmission lines of all voltage level and also of Power plant.
ii) Diagnostic & Condition Monitoring of all electrical equipment.
iii) Site testing of Transformer oil.
iv) Failure Investigation of EHV/HV Power Equipment
2.SAMAGRA NIREEKSHAN WA MULYANKAN:
The activities carried out are-
i) Third Party Inspection:
Witnessing the Factory Acceptance Test [FAT] as 3rd party, on behalf of purchaser for all electrical equipment and their components/parts used in AIS& GIS substation/switchyards as well as transmission lines of all voltage levels and also power plants.
ii) Assessment of capacity & capability of manufacturing works:
Evaluation of manufacturing capacity & capability of works related to electrical equipment and their components/parts used in AIS & GIS substation/switchyard as well as transmission lines of all voltage levels and also powerplants.